Redco Future Metropolis (Jinan,China)
Release time
:2024-01-05 10:01:14 Views:
Project Start Date: November 2021
Project Location: 104 Weisan Road, Jinan, Shandong Province, China,251403
Project Scope: All Ground-Level and Basement Levels
Total Construction Area: 18822.74m2(Over 202,548.18 ft2)
Project Overview:
The Redco Future Metropolis project aims to become a high-quality complex, centered around a large commercial plaza, a star-rated hotel, and showcases of artificial intelligence research achievements. It will also integrate various functions, including science education, culture, entertainment, dining, and shopping, creating a vibrant, multifunctional district.
Bimodeling utilizes 3D laser scanning technology to perform point cloud scanning of the building structure, comparing the point cloud model with the BIM model to generate inspection reports. Additionally, BIM technology is used to create discipline-specific BIM models based on 2D construction drawings and detect clashes between disciplines. This approach effectively controls drawing quality, prevents issues such as rework and modifications due to design conflicts between disciplines during construction, and fundamentally reduces construction costs while improving efficiency.
Project Detail:
1. BIM Model
Using relevant tools to create BIM models for each component
Merge and compare the on-site point cloud model with the BIM model to verify if the construction aligns with the construction drawings, and generate an inspection report.
Project Location: 104 Weisan Road, Jinan, Shandong Province, China,251403
Project Scope: All Ground-Level and Basement Levels
Total Construction Area: 18822.74m2(Over 202,548.18 ft2)
Project Overview:
The Redco Future Metropolis project aims to become a high-quality complex, centered around a large commercial plaza, a star-rated hotel, and showcases of artificial intelligence research achievements. It will also integrate various functions, including science education, culture, entertainment, dining, and shopping, creating a vibrant, multifunctional district.
Bimodeling utilizes 3D laser scanning technology to perform point cloud scanning of the building structure, comparing the point cloud model with the BIM model to generate inspection reports. Additionally, BIM technology is used to create discipline-specific BIM models based on 2D construction drawings and detect clashes between disciplines. This approach effectively controls drawing quality, prevents issues such as rework and modifications due to design conflicts between disciplines during construction, and fundamentally reduces construction costs while improving efficiency.
Project Detail:
1. BIM Model
Using relevant tools to create BIM models for each component
Part of Civil Model
Part of MEP Model
2. Construction Phase
Using 3D visualization tools to guide on-site construction
Using 3D visualization tools to guide on-site construction
BIM Generates Different Outcomes
3. Inspection StageMerge and compare the on-site point cloud model with the BIM model to verify if the construction aligns with the construction drawings, and generate an inspection report.
Example Issue